The Banner Bank Building
950 W. Bannock Street, Boise ID

WHO:
Christensen Corporation

WHAT:
Direct digital control (DDC) system integration at two year old, 12 story, 185,090 SF, LEED Platinum commercial office building.

WHY:
High utility costs, low occupant comfort, and marginal control of HVAC equipment, despite the fact that a new DDC system had been installed at construction only two years before.

HOW:
Clima-Tech integrated 3200 data points from the existing DDC hardware into our WebCTRL® software; worked with building engineer to fine-tune system operation after project completion.

RESULTS:
Significant reduction in utility costs, comfortable occupants, a finely-tuned and easy-to-use control system, and a satisfied building engineer.